---
title: "Case Study: Ultra Precision"
description: You have probably heard enough of others preaching the benefits of a pre-engineered steel building.
image: https://www.novabuildingsasia.com/hubfs/rsw_1280-51.webp
---

# Case Study: Ultra Precision

![](https://www.novabuildingsasia.com/hubfs/engineer-director-1.png)

##### Engineering Director

[** Mar 27, 2026 7:18:59 AM ](https://www.novabuildingsasia.com/resources/case-study-ultra-precision#)

[** ](https://www.novabuildingsasia.com/resources/case-study-ultra-precision#)

#### Table of Contents

**

1. [The Growing Demand for Modular Warehouses and Prefabricated Steel Structures](https://www.novabuildingsasia.com/resources/case-study-ultra-precision#sec_1)
2. [Understanding the Key Differences Between ASCE 7-05 and ASCE 7-22 — A Practical Guide for Structural ...](https://www.novabuildingsasia.com/resources/case-study-ultra-precision#sec_1)
3. [Fire Protection](https://www.novabuildingsasia.com/resources/case-study-ultra-precision#sec_3)
4. [PEB vs Conventional Steel and Concrete Frame](https://www.novabuildingsasia.com/resources/case-study-ultra-precision#sec_4)
5. [Weather Resistance Preparation](https://www.novabuildingsasia.com/resources/case-study-ultra-precision#sec_5)

![rsw_1280-51](https://www.novabuildingsasia.com/hs-fs/hubfs/rsw_1280-51.webp?width=900&height=669&name=rsw_1280-51.webp)

You have probably heard enough of others preaching the benefits of a pre-engineered steel building. Lightweight, fast erection time, easy to construct, clear spans, flexibility of expansion, no waste during construction, low maintenance… … and the list goes on.

After you are convinced, you enter a maze of finding the right pre-engineered building provider. Every provider claims they have quality. So, what does the one-word-fits-all term ‘quality’ mean? How will ‘quality’ ensure you enjoy the value of a pre-engineered building?

Shera’s newly erected facility is a case in point. The new facility is an extension of an existing pre-engineered steel building. To develop this extension, Nova Buildings worked closely with the project consultants to design connections between the existing and the new building. A highly advanced detailing software, Tekla, was used to ensure ‘zero error’ in the bracket connection levels indicated by Nova Buildings.

*“This is a crucial point – any error in the bracket levels would have led to a misfit of the new structure with the existing structure, and result in massive rectifications on site”, said Mr Jalaj Sharma, Engineering Director of Nova Buildings.*

In addition, the factory fabrication schedule was adjusted to allow actual site welding levels of the brackets to be cross-verified between site and factory during the simultaneous fabrication and erection process. A 100% factory-controlled manufacturing condition is amplified in this instance.

‘Quality’ is an overused term. **Ultra precision in project delivery is what we really mean.** A ‘zero error’ engineering design coupled with an ultra-precise factory production ensure your pre-engineered steel building fits seamlessly, allowing you to enjoy all the benefits a pre-engineered building can provide.

 

[Return to resource page](https://www.novabuildingsasia.com/resources)

### [Fast Track Buildings for Emergency](https://www.novabuildingsasia.com/resources/fast-track-buildings-for-emergency)

[ Read More ](https://www.novabuildingsasia.com/resources/fast-track-buildings-for-emergency)

Mar 27, 2026 7:31:00 AM

### [Mezzanines & Canopies](https://www.novabuildingsasia.com/resources/resources/mezzanines-canopies)

[ Read More ](https://www.novabuildingsasia.com/resources/resources/mezzanines-canopies)

Mar 27, 2026 7:41:51 AM

### [Multistorey Mid-rise Pre-engineered Buildings](https://www.novabuildingsasia.com/resources/multistorey-mid-rise-pre-engineered-buildings)

[ Read More ](https://www.novabuildingsasia.com/resources/multistorey-mid-rise-pre-engineered-buildings)

Mar 27, 2026 7:10:33 AM

```json
{
  "@context" : "https://schema.org",
  "@type" : "BlogPosting",
  "author" : {
    "@type" : "Person",
    "name" : "Engineering Director",
    "url" : "https://www.novabuildingsasia.com/resources/author/engineering-director"
  },
  "dateModified" : "2026-04-02T21:06:32.586Z",
  "datePublished" : "2026-03-26T23:18:59.000Z",
  "headline" : "Case Study: Ultra Precision",
  "image" : [ "https://www.novabuildingsasia.com/hubfs/rsw_1280-51.webp" ],
  "mainEntityOfPage" : {
    "@id" : "https://www.novabuildingsasia.com/resources/case-study-ultra-precision",
    "@type" : "WebPage"
  },
  "publisher" : {
    "@type" : "Organization",
    "logo" : {
      "@type" : "ImageObject",
      "url" : "https://www.novabuildingsasia.com/hubfs/NOVA%20BLDGS_Inline_Color_Tagline.png"
    }
  }
}
```